Multi-Site Boiler Making - Subsea7

← Back to Projects
Subsea7 from Brazil Em alto-mar
Multi-Site Boiler Making - Subsea7
  • Client: Subsea7
  • Location: SP, RJ, ES (5 states)
  • Period: 2010-2014 (4 years)
  • Category: OFFSHORE
Contact Us
 
 
 
 
 
 
 
  HISTORICAL CONTEXT: Executed by Tecnoporto (predecessor company), of which the current director of EGS Global was a partner. Expertise and methodologies are the foundation of the EGS Global Group.   THE OFFSHORE BOOM 2010-2014: golden era of Brazilian oil. Subsea7 expanded aggressively and found Tecnoporto as a local partner.   SCALE CHALLENGE Simultaneously managing:
  • 100+ employees
  • 3 states (SP, RJ, ES)
  • Multiple critical projects
  FLAGSHIP PROJECTS
  • Lula North and South Buoy Systems
  • Sapinhoá Buoy System
  • Overdrum Project
  • Seven Oceans Vessel
  SOLUTION: ORGANIZATIONAL STRUCTURE Hiring and developing supervisors - 1 for every 8-10 professionals. This structure is still used today at EGS Global.   LEGACY Although Tecnoporto closed during the Lava Jato crisis (2014), the experience was fully transferred to the EGS Global Group (founded 2020).   DATA
  • Employees (peak): 100+
  • Duration: 4 years
  • States: 3
  • Main projects: Lula North/South, Sapinhoá, Overdrum

Your project demands absolute reliability. EGS Global delivers.

Certified team (ISO 9001, IRATA, AWS), a track record of 150+ delivered projects, and the ability to operate in critical environments with Zero Downtime. If you are looking for a flawless, on-time, fully traceable solution, talk to our engineering team.

Talk to Us